Commercial

Construction of CC road & Drain on Mahabala-Itala-Ajangaon ODR-100 at mahabala Village Portion, Taluka- Seloo Dist. wardha

Key Details:- Dept. = Zilla Parishad, Works Division, wardha Cost = 40 Lac Time req. for completion = 9 months The Zilla Parishad, Works Division in Wardha is proposing the construction of a cement concrete road and drainage system on the Mahabala-Itala-Ajangaon ODR-100 at the Mahabala Village portion, Taluka Seloo, Wardha district. The project is expected to cost 40 lac…

Read more

Reconstruction of Pendse’s Residence, Nagpur

Reconstruction of Pendse’s Residence, Nagpur

Key Details:-  Cost – 60 Lakhs Time Required – 8 Months The reconstruction project of Pendse’s residence is a comprehensive project that aims to completely transform the existing living space. The project will involve a wide range of construction and renovation works to improve the overall functionality and aesthetic appeal of the residence. The cost of the project is 60…

Read more

Proposed upgradation for Drugware building at District Health Office Premises, Wardha

Proposed upgradation for Drugware building at District Health Office Premises, Wardha

Key Details: –  Dept. = National Health Mission Mumbai Cost = 62 Lac Time req. for completion = 5 months The National Health Mission Mumbai is proposing an upgrade project for the drugware building at the District Health Office premises in Wardha, Dist Wardha. The project aims to improve the storage and distribution of essential drugs in the area by…

Read more

Construction of Submersible bridge at chitoda Dist. wardha

Construction of Submersible bridge at chitoda Dist. wardha

Key Details:-  Dept. = Pradhan mantri gram sadak yogna (PMGSY)  Cost = 73 Lac Time req. for completion = 9 months The Pradhan Mantri Gram Sadak Yojana (PMGSY) is constructing a new submersible bridge in Chitoda Dist, Wardha. This new infrastructure will provide a safe and reliable crossing over the water body, increasing connectivity and accessibility for the local residents.…

Read more

Construction of Submersible bridge at sarul Tah. babulgaon Dist. Yavatmal

Construction of Submersible bridge at sarul Tah. babulgaon Dist. Yavatmal

Key Details:-  Dept. = Pradhan mantri gram sadak yogna (PMGSY)  Cost = 73 Lac Time req. for completion = 9 months The Pradhan Mantri Gram Sadak Yojana (PMGSY) is undertaking the construction of a submersible bridge in Sarul Tah, Babulgaon Dist, Yavatmal. The new bridge will provide a safe and reliable crossing over the water body, improving connectivity and accessibility…

Read more

Construction and extension of existing VR From 0/000 to 9/200 Gharfal Tah. Babulgaon Dist. Yavatmal

Construction and extension of existing VR From 0/000 to 9/200 Gharfal Tah. Babulgaon Dist. Yavatmal

Key Details: – Dept. = Pradhan mantri gram sadak yogna (PMGSY)  Cost = 4.3 Cr Time req. for completion = 18 months The Pradhan Mantri Gram Sadak Yojana (PMGSY) is undertaking a construction and extension project of an existing Village Road (VR) from 0/000 to 9/200 in Gharfal Tah, Babulgaon Dist, Yavatmal. The project aims to improve the connectivity and…

Read more

Construction of kitchen shed and slaughterhouse, Girad Tah. Samudrapur Dist. wardha.

Construction of kitchen shed and slaughterhouse, Girad Tah. Samudrapur Dist. wardha.

Key Details: – Department = Public works Department, Wardha Cost = 50Lac Time req. for completion = 7 Months The Public Works Department in Wardha is embarking on a significant construction project that aims to improve the infrastructure in Girad Tah, Samudrapur Dist, Wardha. The project includes the construction of a kitchen shed and a slaughterhouse. The kitchen shed will…

Read more